Showing posts with label Seabird Massacre. Show all posts
Showing posts with label Seabird Massacre. Show all posts

Wednesday, July 8, 2015

Alameda's Contaminated Lagoons Exposed to California Water Board

"Environmental abuse is like racism; people are so
conditioned to it that it seems invisible."
Duck shock in Alameda's Lagoon #1

(For the record, I have the utmost respect for the Water Board and its staff. Their responsibility is immense; their budget is tight; and work must be prioritized. This regional office deals with major health threats like mercury and PCBS and major polluters like large dairy operations for nine counties and 76 municipalities. I sat through 5 hours of deliberations and presentations before returning a second time for a chance at the microphone. These dedicated professionals quietly go about the invisible job of protecting our health and lives.)


Alameda's aging finger lagoons are subject to state and federal environmental laws, and they're an environmental disgrace to the otherwise beautiful and progressive city of Alameda.

Today I presented a plea for strict enforcement of storm sewer regulations (see attached) at a hearing in the Elihu M. Harris State Building auditorium to the Regional Water Quality Control Board and attendees. It was highly satisfying to finally get in front of sympathetic and responsible authorities who can take appropriate action. (Here is a complete transcript of my presentation: July 8 Water Board Presentation)

The images projected onto a wall-sized screen in dimmed light were highly effective, and I delivered my rapid-fire opening statement like a prosecuting attorney. The words had been honed down to a bare minimum to fit the 3-minute format.

There's nothing special in the words I spoke. It was the simple truth people have been avoiding for years. Environmental abuse is like racism, people are so conditioned to its presence that it seems  invisible. Now the secret shame of the lagoons is out in the open.

There was a point, early on, when I sensed a hush in the place and I knew I had everyone's rapt attention. The comments from the Board Chair were rich with appreciation and concern. There was no substantive rebuttal. The Board staff seemed embarrassed, saying water quality in the lagoons was a long-known problem and would receive more attention.

It was immensely satisfying, a day I will not forget.

Nor, I suspect, will the people present.


The Water Board will be looking into the matter, and I now have friendly face-to-face relations there .



Great white egret in Marin County

There's a win-win-win solution begging to be implemented here that involves innovative thinking.

An eco-minded architect could design self-funding solar-collecting sculptures that also aerate while reducing the solar footprint on the lagoons, thereby increasing aesthetics while solving the algae problem.

Whats up, millennials? My generation Messed up. Let's put our heads together and make Alameda a model for eco-sensible partnering between man and nature. Property values would be enhanced and we could all be proud of the result.

All the Bay Area Universities should be falling over each other to solve this problem. You can't tell me that with today's technology we can't come up with a solution that preserves the beauty of the lagoons while restoring the richness of their natural function as marine habitat.

This is how they do it in Vancouver
Bayside water garden in Vancouver, B.C.


My dream is the return of seabirds to Alameda's finger lagoons. If we can't do this, they should be filled-in and made into a park.

Friday, May 29, 2015

AMP/CGI Drilling Project (Suspect #2) Checks Out


Great white egret at San Leandro Bay

According to Janice Adams of Alameda Power, their horizontal drilling project was completed in May, 2014, and did not involve the use of an oil-based drilling mud additive; so it is highly unlikely the Bird Goo is from that source.

Here's a link to her full response: AMP Response. It's pretty impressive.

So back to Suspect #1, the Lagoon Seawall Sewer Replacement Project.



Thanks to the folks at Alameda Sun, the word is getting out about our search for the Bird Killers.

Alameda Sun, May 21, 2015


Wednesday, May 20, 2015

The Goleta Nightmare: The Storm Sewer Delivery System


" What government body approved this pipeline design? What responsible authority would allow such inept engineering to be foisted upon the public? At what point do political cronyism and bureaucratic indifference become criminal negligence?"



Santa Barbara's Nightmare

Santa Barbara's Nightmare has returned. Delivered unimpeded with pinpoint accuracy by a storm sewer running along Highway 101, crude oil has again blackened a formerly scenic California beach and decimated a marine ecosystem. Didn't we learn anything from the '69 Santa Barbara disaster?

Click here for the breaking story from CBS: Santa Barbara's Nightmare , Do I need to describe the grim landscape that will appear on tonight's six o-clock news? Black sludge-covered seabirds and otters, seals and sea lions, struggling for life. An undulating mass of blackened seaweed where foamy breakers formerly rolled shoreward.

The Goleta oil spill reveals flawed engineering from horse-and-buggy days rife with ecological ignorance and indifference.

Why weren't automatic shut-off valves operating? Where was the backup system? A drop in pipeline pressure should have stopped the pumping and triggered an investigation. Catch basins could have been built along the pipelines for ease of clean-up and to prevent spillage from reaching sensitive areas. What design considerations were made for local seismic conditions?

Post-1969 and considering the high threat of earthquakes, catch basins should have been required. It is criminally deficient to not include even the simplest environmental safety features in pipeline design. We can send spacecraft to Saturn and beyond, but we can't build and safely operate a simple pipeline?

And don't use the worn-out cost excuse. Cost gets factored into the feasibility of the project. Safety is integral to cost. Are we mentally impaired when it comes to the design of ecologically prudent oil pipelines?

What government body approved this flawed pipeline design? What responsible authority would allow such inept engineering to be foisted upon the public? At what point do political cronyism and bureaucratic indifference become criminal negligence?

Lack of regulatory oversight was a major factor in the Goleta tragedy: Click here for an expose on how the pipeline operator dodged regulation  "Because the county was denied the regulatory authority to require that Plains equip its pipeline with an automatic shut-down valve in case of a rupture, The Santa Barbara Independent has discovered, the Plains pipeline is the only pipeline in the county without this key safety feature. "

The corporation must pay damages, but real accountability means some corporate types need to be in handcuffs and orange jumpsuits.


Storm sewers may be implicated in the still unsolved 2015 Seabird Massacre, presently under investigation by the Department of Fish and Wildlife, the Alameda County Department of Environmental Health, and myself. (This investigation is the main purpose of this web site.)

Storm sewers. We never think about them, but they are pipelines for toxins into San Francisco Bay. What goes down the gutter ends up in our marine environment.

Goleta and the Seabird Massacre are wake-up calls. Attend the June 10 (click here for details) PUBLIC WORKSHOP HEARINGS FOR THE SAN FRANCISCO BAY STORMWATER PERMIT This hearing will consider comments regarding pending action which will help protect the entire San Francisco Bay from the discharge of toxic waste through storm sewers.

Don't let this happen to San Francisco Bay:


If you can't be at the hearing and have comments or questions, post them here on this blog and I will present them on your behalf at the hearing and post the follow-up here.

Here's a list of Bay Area politicians and organizations who can effect change: Whom to Contact

How many seabird massacres does it take for you to take action?

Goleta coastline, May 19, 2015.


Monday, May 11, 2015

Encouraging News in Quest to Protect the Seabirds

(This page is reserved for encouraging news in our mission to find the cause of Alaemda's October Toxic Spill and the Mystery Goo and take corrective action.)

May 11, 2015: GREAT NEWS! Today the Regional Water Quality Control Board issued a Tentative Order for the National Pollutant Discharge Elimination System (NPDES) permit under the Clean Water Act covering municipal stormwater discharges. What this order does, subject to changes after public hearings in June and July, is effectively a ZERO TOLERANCE edict against storm drain emissions other than storm water.

This means: No contaminants whatsoever. No fertilizers. No herbicides. No algicides. No surfactants. No blue dye to fight lagoon algae. It also means restrictions and monitoring at construction sites, which would ostensibly prevent the use of oil-based drilling fluids like what (I suspect) was responsible for the January 2015 Seabird Massacre. (This will be covered in a paper I plan to submit and speak on at the June10 hearing.)

PLEASE SEND ME YOUR COMMENTS AND INPUT TO BE INCLUDED. You can e-mail me or attach a comment here on the blog.



April 14, 2015: This morning's missive from the dedicated folks at International Bird Rescue in Fairfield:
"Dear Mr Heying,Thank you so much for taking the time to email your information and idea about the Mystery Goo to us. I have forwarded a link to your blog, as well as your email to the State investigators who are still working on the this case and determined to find the responsible party.
Barbara Callahan Interim Director International Bird Rescue www.Bird-Rescue.org"

Did a Coast Guard Island Drilling Fluid Disaster Kill the Seabirds?

"Such a fracture could leak drilling fluid into the Bay Area basin and watershed with catastrophic consequences to marine life such as the Bay Area's 2015 Seabird Massacre."


Suspect Number Two in my investigation is last year's trans-Estuary directional drilling project to string conduit to Coast Guard Island from Alameda. In the shot below, Alameda is to the left and Coast Guard Island is bottom center. (Refer to the attached Initial Study for a detailed project description.)
Coast Guard Island in Foreground

The material spewing into the air in the picture below is drilling fluid, an essential material in almost all earth-boring projects like last year's Alameda Municipal Power bore under the Estuary to lay 1,700 feet of flexible conduit to serve the Coast Guard's needs.

This Youtube video shows what can go wrong: Link to Video of Directional Drilling Nightmare

Directional Drilling Nightmare

Drilling fluid is often used under high pressure, so a massive uncontrolled discharge such as this could happen deep under water and go temporarily unnoticed by everyone but the drilling crew. A geologist should be consulted before using a rock bit anywhere near Bay Area waterways because of the risk of fracturing the often fragile native subsurface geologic formations. Such a fracture (called a "frac-out") could leak drilling fluid into the Bay Area basin and watershed with potentially catastrophic consequences to marine life such as the 2015 Alameda Seabird Massacre.

A drill bit could also hit a subterranean air pocket and fill it with drilling fluid that later leaks to the surface. For that matter, the entire 1,700-foot bore could contain drilling mud residue that continues leaking into the marine environment long after project completion.


Elsewhere in this blog I report that the Bird Goo lab analysis matches a type of additive used in drilling mud. Such additives are for various purposes, such as accelerating the rate of penetration (ROP), thereby reducing the cost of a project and enabling a contractor to win-out over higher bidders.

But speed can lead to mistakes, and accidents can happen. There's insurance to cover such eventualities.

I have asked the Coast Guard for a contact who can answer questions about the CGI drilling project. I will also speak to someone at Alameda Municipal Power.

There a questions to be answered: Were proper engineering standards for environmental protection followed? Was the bidding process deficient? The drilling was practically in AMP's backyard. Did they have on-site supervision throughout the project?

California Trenchless, Inc. was the drilling contractor. I have questions for them too, like how much drilling mud was used, and what kind. What kind of additives were used and how much? How did they dispose of waste drilling mud? What geological data did they use to ensure environmental safety? Did they do any post-project testing for drilling mud leakage? If so, what were the results? How much experience did CTI have in drilling projects of this scale?

Whenever there's dredging in the Bay Area, a Water Quality Board rep is on site testing turbidity every ten minutes. Drilling mud is equally if not more ecologically risky than turbidity. Was a Water Board rep present during drilling? If not, why not?


I am aware of only two significant drilling projects in the vicinity of Alameda within the relevant time frame prior to the Seabird Massacre--the Lagoon Seawall Sewer Replacement and the Coast Guard Island Conduit project. If anyone knows of another, speak up.

The finger of suspicion points at these two drilling projects and lagoon dredging in Alameda ongoing prior to the Seabird Massacre. Maybe all three played a role in the massacre. I am intent on probing these areas until answers are out in to the open.

Thursday, May 7, 2015

Seniors Comprehend Lagoon Portal Bird Goo Theory

"...to date, no other plausible theory has been proposed explaining the source of the Bird Massacre Mystery Goo..."

The Lagoon Portal Theory is based on a solid foundation irrefutable facts detailed below in a summary of my presentation to a group of thirty seniors at Alameda's Independence Plaza yesterday. Their questions stretched my planned twenty-minute multi-media talk to well over an hour. Large photos and other hand-outs were accompanied by videos of lagoon dredging, directional drilling and drilling mud.

The Lagoon Portal Bird Goo Theory asserts that January's bird-killing Mystery Goo came from drilling mud released into Alameda's lagoons last fall during a sewer replacement project scheduled at the same time the lagoons were being dredged.

As of today, May 7, 2015, no other plausible theory has been proposed explaining the source of the Bird Massacre Mystery Goo, nor has anyone credibly refuted the Lagoon Portal Theory. City management has been copied on practically every major posting on this blog, yet their silence is deafening.

Fine. I have what I believe will be "smoking gun" physical evidence in my cross-hairs. In the next few days I expect hard proof in hand of a massive release of drilling mud into the lagoons. Wish me luck.

Independence Plaza

The seniors at Independence Plaza were an enthusiastic audience, many of whom are eager to get involved. They clearly understood the Lagoon Portal Theory despite the complexities, and they understood the implication that if the perpetrators of the 2015 Bay Area Bird Massacre are allowed to go unpunished, it is an invitation for repetition.


MYSTERY GOO FACTS AND FOLLOW-UP

FACTS:
1. Two eyewitness accounts of a plume of Grey Sludge from the direction of a Lagoon Portal
2. Lagoon Dredging was underway for the 2 weeks prior to sighting of the Grey Plume
3. The Plume contained debris consistent with dredging
4. Photo evidence of a Foaming Surfactant in a lagoon similar to oil spill clean-up
5. Seabirds were killed by a mysterious Grey Goo soon after sighting the Plume
6. Grey Goo lab analysis matches drilling fluid
7. Two City drilling projects Llagoon Seawall Sewer Replacement and Coast Guard Island Power Conduit) were conducted prior to Plume sighting
8. An abandoned trench adjacent to lagoons is consistent with drilling activity
9.  Nearby tidal currents are conducive to distribution of lagoon emissions on seabird habitat
10. Photo evidence of seabird habitat degradation near lagoon portal during relevant time frame
11.The Lagoon Portal and CGI Conduit are the only plausible Goo sources proposed to date
12.No credible refutations of these two sources have thus far been advanced

OBJECTIVE: A commission to…
•  Investigate Alameda's drilling and dredging projects for linkage to the  seabird massacre
•  Evaluate the environmental risk of using chemicals in the lagoons
•  Evaluate the responsiveness of emergency services to environmental threat
•  Propose an Environmental Good Samaritan ordinance offering a bounty for reporting polluters
•  Review and/or propose a city environmental policy
•  Advise Mayor on establishment of a city office of environmental awareness

MORE INFO: www.AlamedaGoo.org

ACTION YOU CAN TAKE:
Tell government representatives you are concerned about the ecosystem and want a reporting system and consequences for toxic damage. Sign a petition soon to be circulated. Visit the AlamedaGoo blog to learn more. Share what you learn.

GOVERNMENT CONTACTS:
Senator Mark Leno – 916.651.4011- no email -- c/o  ali.bay@sen.ca.gov
Assemblyman Rob Bonta – 510.286.16701 – info@robbonta.com
Mayor Trish Spencer – 510.747.4701 - tspencer@alamedaca.gov
Alameda City Council – 510.747.4722 - clerk@alamedaca.gov - 2263 Santa Clara Ave, Alameda, CA 94501

OTHER CONTACTS:
Monty J Heying - 510-872-3144 - MHeying777@yahoo.com
April B. Squires - 415-592-4119  - Squires.April@gmail.com
Michael  Dunmore - 510-263-8122 - iopenmymail@gmail.com
Golden Gate Audubon Society -  510-843-2222 - 2530 San Pablo Ave # G, Berkeley, CA 94702


Check out the Prime Suspect: Click here to learn about the Mystery Goo Prime Suspect.

Sunday, May 3, 2015

Mystery Goo Suspect #1--a Seawall Sewer Job

"There's yellow and black barrier tape in the bottom of the trench. Is/was there an ongoing investigation (other than mine)?"


The bid document  for a seawall sewer line replacement adjacent to Alameda's finger lagoons provides clues to how a massive amount of drilling mud could have gotten into San Francico Bay via the lagoons causing the January, 2015, massacre of 300 seabirds.

Following are illustrations relating to the seawall sewer line replacement project mentioned in my April 18 post "Mystery Bird Goo Matches Drilling Mud."

This project is the most likely source of the Mystery Goo uncovered so far because of the close proximity of the project to the lagoons and the likelihood the project entailed the use of a drilling mud matching the Mystery Goo's lab results.

Here's the quote from the bidding document:
"5. Installation of sewer pipe by horizontal directional drilling of +- 91 LF of 8" sewer main between two manholes in close proximity to existing homes using front steer guided bore and jack method with steel bend VCP. Install new sewer manhole and rehabilitate existing sewer manhole with epoxy/cement like coating on Hawthorne Street." 
Hawthorne Street is a few blocks west of Paru Street, where another part of the sewer project takes place. These photos concentrate on a Paru Street trench scaled down in dimensions and depth from a directional drilling project I observed last summer at the opposite end of Grand Avenue for pulling power conduit under the Estuary to Coast Guard Island.

The ten-inch sewer pipe mentioned in the bid document appears in the distance behind the fence bordering Grand Avenue (Image 3a.) The proximity of the sewer line to the lagoon is evident. Drilling near that pipe would risk leakage of drilling mud into the lagoon.
(Click photo to enlarge)

 Image 3b shows the scale of this western  section of the network of finger lagoons. (You can "drill down" with Google Maps for a broader perspective on these finger lagoons.)


Image 3c gives a closer view of the rusty ten-inch pipe shielded from the elements by a roof of rusted corrugated tin. The large red round structure is a pumping station scheduled for replacement as part of the project. Has this portion been delayed? Why?


Image 3d is a cose-up of the pipe from the opposite side of the chain-link fence where Paru Street dead-ends at the lagoon.. Note the white arrow spray-painted along the fence, perhaps to show workers the direction to drill.


Image 3e shows a trench covered with a thin sheet of plywood. As mentioned above, this trench is similar in dimensions and depth to the trench in the CGI drilling project completed last summer. A collapsed "City of Alameda" safety barrier sign lies flat at the far end of the trench.


Image 3f is a close-up of the trench with the city sign arranged for ease of reading. Drilling would have begun just below the left "toe" of the sign and made a left turn toward Grand Avenue, as the white arrow indicated.


The following Youtube link illustrates a drilling method similar to the one specified in the bid document: (Click here for video illustrating a similar drilling project.) Note the drilling fluid being released through the drill bit. Guided directional drilling can be accomplished with a variety of equipment, but it's a well-established technology.


These photos raise as many questions as they answer, but they suggest that drilling occurred here and that the City was involved. Fresh grass has begun growing on adjacent piles of loose fill dirt. The City sign, the apparent age of the of the trench, the trench's proximity to the lagoon seawall and the specification of "directional drilling" in the bid document all imply this trench could have had something to do with the sewer line replacement project.

The dirt at the far end of the trench was quite damp, while the uphill portion was dry. This indicates the seawall is not sealed if lagoon water can seep into the trench and that drilling fluid could have seeped through into the lagoon.


Why has the trench remained open all this time? Why is an unsafe trench left exposing passersby to injury? Did the contractor(s) drill at the wrong location? Was there a miscommunication or was this an approved test outside the scope of the sewer replacement project? There is yellow and black barrier tape in the bottom of the trench. Is/was there an ongoing investigation (other than mine)? If so, what were the findings and conclusions?

A forgotten trench at the end of a dead-end street.

The mystery continues.


Incidentally, below are a couple of photos I took of a snowy egret just below the culvert mentioned at the beginning of this article. Note the familiar grey smudge on its head. Five months after the first bird deaths, the goo keeps showing up.

 

Saturday, April 18, 2015

The Mystery Bird Goo Matches Drilling Mud

"Compare the grey on the duck's chest with the color of the drilling fluid..."



Strong indications have surfaced that a type of drilling mud is a likely source of the "Mystery Goo" that killed and injured hundreds of Bay Area seabirds this winter. All five of the goo's chemical components are present in the type of drilling mud described in detail in this patent application.*

Drilling fluid, or "mud," is a concoction of liquids and other materials used in drilling boreholes into the earth. The main function of the viscous liquid is to provide back pressure to prevent other fluids from coming up, to bring cuttings to the surface, and to lubricate, cool and clean the drill bit. Well-drilling involves drilling mud and waste mud must be disposed of. Here's a video illustrating how drilling mud works: Click here for Youtube clip on drilling mud.

Laboratory analysis of the Mystery Goo was reported by California Fish and Wildlife's Janna Rinderneck to contain five types of material: "silicone fluids, tung oils, resins or rosin oils, animal fats, and edible or inedible seed oils from plants." All five of these categories are present in the type of drilling compound described in detail in the above patent application.

One-hundred percent is a pretty strong indication that some form of drilling mud is repsonsible for the Goo.


How did drilling mud get into the waters that surround Alameda where the bird massacre occcured?

Last year, two large drilling contracts were let in Alameda--one by the Department of Public Works for replacement of a sewer line in a lagoon seawall** and the other by Alameda Municipal Power for running conduit across the Oakland-Alameda Estuary to Coast Guard Island. The CGI project began and ended before the October 12 sludge spill.

The project schedule for lagoon seawall sewer line replacement calls for contract award Sept 2, in plenty of time for a hemorrhage of drilling fluid into the lagoons to occur before October 12.


Dredge in Alameda lagoon

Alameda Public Works also conducted major lagoon dredging in the months prior to and including the first two weeks of October, 2014.




Lagoon,showing white and grey foam
















The photo at right reveals the apparent use of a white foaming agent and/or a surfactant to clarify lagoon water after dredging.

A well-drilling surfactant matching 80% (4 out of 5) of the Goo's chemical components shows up in a 2007 patent application.***






Duck saturated with "Mystery Goo"

Around the same time the grey and white foam was photographed floating in the lagoons, a plume of foamy grey sludge was reported in San Leandro Bay. The lagoon foam, the San Leandro Bay sludge and the Bird Goo all are grey.

Compare the grey on the duck's chest with the color of the drilling fluid in the top photo.


On October 12, 2014, the plume of sludge was seen entering San Leandro Bay from the direction of a lagoon portal just west of the Otis Street/Bay Farm Bridge. The plume was observed moving from there into and down the Oakland-Alameda Estuary toward San Francisco Bay on the outgoing tide. (See below for a map depicting tidal currents around Alameda.****) By mid-January, 2015, hundreds of seabirds caked with a grey goo of unknown origin were found near Alameda.

Alameda Public Works was in charge of lagoon dredging and water clarity and also of the seawall sewer project that entailed the use of a drilling fluid, possibly the type described in the patent application mentioned in the first paragraph of this page. Did the seawall drilling project expel a ton of drilling mud into a lagoon? Was that covered up by lagoon dredging and then cleaned up with a foaming agent and a surfactant?

Eye-witness observations, visual characteristics, time frames and the lab analysis of the Bird Goo all support a connection between the Goo and Alameda's lagoons and drilling projects.

Public Works has some questions to answer.



*See patent application for drilling fluid containing all five of the Bird Goo's ingredients (silicone, tung oil, seed oil, resin and animal fats): Click here for patent application for drilling fluid

**See bidding notice for drilling contracts: Click here for bidding notice

***A 2007 patent application for a surfactant used in well drilling reveals a combination of materials that include polymeric fluids (e.g., silicone) tung oils, fish oils (animal fat) and various seed oils: Click here to examine patent application for well-drilling surfactant.

****Here is a map and discussion of Alameda's tidal currents: Click here for explanation of tidal movements







Thursday, April 16, 2015

Well-drilling Surfactant Matches the Mystery "Goo"


Progress is being made in identifying the seabird-killing Mystery Goo.

A 2007 patent application (see below) reveals that a surfactant* used in well drilling contains components matching eighty percent (four out of five) of the Goo's ingredients.

Silicone fluids**Tung oil, seed oil, and animal fats (e.g., fish oil) are present in the surfactant and are among the five Goo components in lab results reported by Janna Rinderneck, the Fish and Wildlife scientist who managed the Goo's testing.

As quoted in SFGate.com, Rinderneck lists five probable components of the Goo:
"Scientists at several state and federal laboratories determined after more than two weeks of research that the substance was 'a mixture of nonpetroleum-based fats or oils.' ...'The exact oil- or fat-based product has not been determined, but likely suspects are:1) silicone fluids, 2) tung oils, 3) resins or rosin oils, 4) animal fats, and 5) edible or inedible seed oils from plants,' said Janna Rinderneck, an environmental scientist with the state Office of Spill Prevention and Response."

As shown below, seed oils, tung oil and animal fats (fish oil) are specifically mentioned in the surfactant's patent application. Silicone, being a polymer, qualifies as the "polymeric additive.":
"...a polymeric additive** coating the powdered solid; wherein the polymeric additive comprises a polymer ...at least one selected from soybean oil, linseed oil, grapeseed oil, cashew nut shell oil; perilla oil, tung oil, oiticia oil, safflower oil, poppy oil, hemp oil, cottonseed oil, sunflower oil, high-oleic triglycerides, triglycerides of euphorbia plants, peanut oil, olive oil, olive kernel oil, almond oil, kapok oil, hazelnut oil, apricot kernel oil, beechnut oil, lupine oil, maize oil, sesame oil, grapeseed oil, lallemantia oil, castor oil, herring oil, sardine oil..."

Here's the full application: Patent Application for Surfactant with Goo Ingredients (Click Here)

Only petroleum has been ruled out. No item from this non-petroleum list has at this point been ruled out, but the presence of four of the five Goo ingredients points to a surfactant as the source of the Goo.

Now all that's needed to prove the Goo originated in Alameda's lagoons is to find residues of these ingredients there.

Or, maybe a whistle-blower will come forward.



*Definition and discussion of surfactants: What is a Surfactant? (Click Here)
**Silicone is a polymer.

Stagnant Lagoons Cause Problems

"... a mixture of non-petroleum-based fats or oils. Non-petroleum oils include synthetic oils, such as silicone fluids, tung oils, and wood-derivative oils such as resin/rosin, animal fats and vegetable oils."


(Below is my opinion piece from the April 9 issue of The Alameda Sun points an accusing finger at Alameda's finger lagoons as the cause of the Bay Area's Seabird Massacre of 2015.)

Built more than fifty years ago, Alameda's Finger Lagoons that stretch from Court Street to Westline Drive have evoked mystic phrases like, "Venice of California." They border some of Alameda's nicest homes. On Google Maps, they look like a thin blue cutworm crawling across the city's main island.

But beauty and cach'e come at a price. The lagoons can be an attractive nuisance. Recently a man was seen dumping a tub of soiled cat litter over the railing of his second floor balcony.

The Finger Lagoons have aesthetic appeal, but for some they have become an ecological nightmare. Global warming has turned stagnant bodies of water into algae farms. Algae love still water, heat and bright sunlight. Last year was the hottest on record in Northern California, with a record number of sunny days as well.

By contrast, the tree-shaded lagoons on Bay Farm Island were designed with 1970s  technology. No fingers impede flow. An aeration system keeps the water oxygenated. The aging lagoons on Alameda Island are not aerated and have little shade. With no aeration system, algae growth in these older lagoons must be controlled with chemicals. It's these chemicals I have a problem with.

Over the past ten years, signs have been posted at Alameda's beaches warning not to go into the water. Some unknown hazard makes peoples' legs sting. Could the mysterious source of that sting be chemicals released from the lagoons?

Our beaches are covered with sand reclaimed from just offshore. Was that sand tested for toxins first? Are tiny children and  mothers safe in that sand?

Last October I observed someone in a Clean Lakes, Inc. truck taking a water sample from a lagoon. According to its web site, Clean Lakes is a global expert in "clarifying" inland waterways with toxic agricultural chemicals. A city engineer told me the company was essentially a lagoon janitorial service. Good thing I'm not that gullible.

The same engineer said the lagoon dredging solids were dumped "at Alameda Point on a toxic hot spot." Well, what about the liquids? You know the ones that went out that pipe into San Francisco Bay?

Last October I observed a plume of grey sludge and debris in San Leandro Bay that I suspect came from dredging the lagoons. This will be hard to prove, but Cal Fish and Wildlife said they would send someone out to take samples. I filed a complaint with the Regional Water Quality Control Board.

We will get to the bottom of this.

Maybe those 1950s-era lagoons should be filled in, made into a park.

#   #   #

Wednesday, April 15, 2015

Alameda's Tidal Curse

The Sludge Could Have Returned Dozens, if not Hundreds of Times

"What I found sent a chill up my spine.  ...Like a toilet flushing backward, the "bad stuff" kept returning. Alameda's Tidal Curse was a death trap for marine life."

Someone asked, "If the sludge you saw in October was the Bird Goo, how could it take from October to January, ten weeks, to kill the seabirds?"

To answer that question I studied tidal charts for October 12, 2014, the day I observed and reported the plume of sludge. What I found sent a chill up my spine.

The sludge took 3 1/2 hours (from 2:40 to 6:10) to transit from the south shore lagoon portal to just beyond the Park Street bridge. It had twice that distance to cover before tide changed at 9:21. It took the entire six-hour tidal cycle for the sludge to arrive at the mouth of the Oakand-Alameda Estuary, then the gooey mess would have been drawn right back up the same Estuary by the powerful ship channel current--BACK INTO SAN LEANDRO BAY WHERE SEABIRDS WERE ROOSTING FOR THE NIGHT!

Then the tide reversed again, and the process was repeated! For weeks, the deadly sludge I saw would have been transported back and forth along the Estuary between San Francisco Bay and San Leandro Bay, dousing hundreds of migrating seabirds again and again with layer after layer of toxic goo. (See illustration below, Image 1fx)

(click to enlarge photo)
Path of Sludge Ploom


Given the strength of the tide in the Estuary and the distance and speed of the tidewaters, whatever is carried out from San Leandro Bay is most likely to return on the next incoming tide. Then the process is repeated, endlessly.

Like a toilet flushing backward, the "bad stuff" kept returning. Alameda's Tidal Curse was a death trap for marine life.

The sludge's mass gradually diminished over time as some got deposited along the shoreline and bits were carried out into San Francisco Bay. But how long did that take, how many cycles? And how toxic were/are the residues to the seaweed and other marine life (fishes, barnacles, mussels, shrimps, crabs?)

San Leandro Bay's formerly robust marine life is feeding habitat for thousands of seabirds and their entire food chain. As food supply diminishes, so goes the seabird population.


The streaks of foam I saw April 12 (See Continuing Evidence of a Lethal Surfactant), if they are remnants of the initial October 2014 plume, could have returned hundreds of times during the intervening six months.

Migrant seabirds came here to fatten up for their return flight north, only to be drenched daily with a mixture of viscous chemical compounds we now know to be drilling mud (click here for April 19 blog identifying the Goo as drilling mud) and a lethal surfactant that got pushed farther and farther inland with each cycle.

Each successive dousing of surfactant would deposit another layer, to the point where death from hypothermia would result. A surfactant that might normally be considered harmless in a single dose would be lethal. (Click here for a detailed explanation of surfactants.)


Due to this Tidal Curse phenomenon, massive and lasting damage has likely been wreaked on the Estuary and San Leandro Bay as the tides have come and gone and layer after layer of toxic chemicals were deposited on rocks and seaweed and all forms of marine life and habitat, from pilings to bird feathers.

The chemical properties of a surfactant make it the ultimate toxin in a marine environment because surfactant molecules seek always to get between water and on-aqueous matter. Since essentially no marine life or habitat can escape a surfactant, its killing power is incalculable.



Saturday, April 11, 2015

What is a Surfactant?

"Think laundry detergent, dish soap."


A mysterious Grey Goo killed or injured five hundred beautiful seabirds in early 2015, many of them from the north on their annual migratory stopover .My research suggests the goo is an emulsion or colloidal suspension* created by the use of an industrial surfactant in Alameda's aging finger lagoons to clarify the water after dredging.

SURFace, ACTive and AgeNT
The term "surfactant" comes from the words, SURFace, ACTive and AgeNT. A surfactant is a chemical substance, usually a liquid, that, among other things, changes the surface tension of water. Common examples would be laundry detergent and household dish-washing soap, which emulsify oils and fats so they can be carried away down the drain.

Surfactants are used in some municipal sewage plants to clarify contaminated water. Surfactants can be used in oil spill clean-up. Oil and water do not mix, but oil can be emulsified by adding a surfactant. It's similar to dunking a greasy skillet into soapy dishwater. Emulsification occurs when surfactant molecules break the oil (or grease) into tiny particles by tightly surrounding them.

A foaming industrial surfactant uses a chemical binding process called "ionic attraction" to attach in a similar way to particles suspended in dirty water. The remaining emulsion or colloidal suspension* can then be skimmed off.
Water Treatment Skimmer

Drill-down with Google Maps on a sewage treatment plant. Those open round vessels with arms extending across are skimmers. (See example at left.)
In the photo at right, it looks as if the lagoons have been turned itno a gigantic laundry tub.

The grey areas (see arrows) denote interaction of the foam with targeted particles (contaminants) stirred up by dredging. This grey material, technically an emulsion or colloidal suspension, is what I suspect to be the bird-killing Grey Mystery Goo reported in the news.

If I am right, the Mystery Goo is essentially an emulsion or colloidal suspension* created by interaction between an industrial surfactant and the contaminants (dissolved and undissolved solids) clouding the water due to the mechanical disturbance of dredging.

The contaminants could also include drilling mud (a fluid used in earth-boring), a form of which was found to match the laboratory analysis of the Bird Goo.

Harmless, but Lethal
Most surfactants are normally harmless to humans, but they can be lethal to waterfowl, especially when dosed repeatedly (See "Continuing Evidence of a Lethal Surfactant" ), because they cut through (emulsify) natural body oils that allow feathers to insulate them from the cold.

When those natural oils are stripped away, the birds die of hypothermia. It is a slow, hideous way to die because of the lengthy suffering it entails.

The chemical properties of a surfactant make it the ultimate toxin in a marine environment because surfactant molecules seek always to get between water and on-aqueous matter. Since essentially no marine life or habitat can escape a surfactant, its killing power is incalculable.

The world's favorite emulsion is ice cream. This was not ice cream.


Breaking News:
It is revealed in an April 19 blog post here that the Goo matches a viscous solution used in well-drilling generically called "drilling mud." (Click here to read the blog about drilling mud matching the Goo 100%.) The drilling mud and the surfactant are comprised 80% of matching materials (tung oil, seed oil, animal fats and silicone.) A foaming agent would emulsify the surfactant and drilling mud, creating a sludge that would float through the lagoon portal out into San Francisco Bay.


Below are several web links to sites that explain surfactants and the process of emulsification.

Web Sites: 
Key Center for Polymer Colloids
"Surfactants": http://discovery.kcpc.usyd.edu.au//9.5.5-short/9.5.5_introsurfactants.html

Youtube Videos:
"32-6 surfactant energy...": https://www.youtube.com/watch?v=ZYLbca-hI5E

"What are emulsions": https://www.youtube.com/watch?v=bC_czAL24zY

"Surfactant. How does a Surfactant Work?" https://www.youtube.com/watch?v=zOGtGmScZzw

"How Surfactants Help You Clean": https://www.youtube.com/watch?v=6HwSJLO_cVs

"Warning: Dispersant/surfactant eats through...": https://www.youtube.com/watch?v=Mt7pC8yzvok


*Wikipedia: "An emulsion is a mixture of two or more liquids that are normally immiscible (unmixable or unblendable) ...colloid is a substance in which microscopically dispersed insoluble particles are suspended throughout another substance.Sometimes the dispersed substance alone is called the colloid;[1] the term colloidal suspension refers unambiguously to the overall mixture,,."

"A foaming agent is a material that facilitates formation of foam such as a surfactant or a blowing agent. A surfactant, when present in small amounts, reduces surface tension of a liquid (reduces the work needed to create the foam) or increases its colloidal stability by inhibiting coalescence of bubbles."


Other References:
Bätje, M., and H. Michaelis. 1986. Phaeocystis pouchetii blooms in the East Frisian coastal waters (German Bight, North Sea). Marine Biology 93:21-27.
Courtemanch, D. 2004. Foam—A cause for concern? http://www.state.me.us/dep/blwq/doclake/foam.htm

Eckhardt, B.W., and T.R. Moore. 1990. Controls on dissolved organic carbon concentrations in streams, southern Quebec. Can. J. Fish. Aquat. Sci. 47:1537-1544.

Fact Sheet: Foam. 2004. Indiana Department of Environmental Management, Office of Water Quality Assessment Branch.
http://www.in.gov/idem/macs/factsheets/media/foam.html

Fendinger, J.J., D.J. Versteeg, E Weeg, S. Dyer, and R.A. Rapaport. 1994. Environmental behavior and fate of anionic surfactants. In, Environmental Chemistry of Lakes and Reservoirs, L.A. Baker (ed.). American Chemical Society, Washington D.C.

Fuller, D. 2003. The occurrence of foam on lakes and streams. Great Lakes Environmental Directory, 394 Lake Ave. S. Suite #222, Duluth, MN 55802. http://www.greatlakesdirectory.org/zarticles/012903_great_lakes1.htm

Gergel, S.E., M.G. Turner, and T. K. Kratz. 1999. Dissolved organic carbon as an indicator of the scale of watershed influence on Lakes and Rivers. Ecological Applications 9:1377-1390.

Maryland Department of Natural Resources. 2004. Harmful Algae Blooms in Maryland. 
http://mddnr.chesapeakebay.net/hab/news_083104.cfm


Wegner, C., and M. Haburger. 2002. Occurrence of stable foam in the Upper Rhine River caused by plant-derived surfactants. Environmental Science and Technology 36:3250-3256.

Thursday, April 9, 2015

Photo Essay Tracking Alameda's Toxic Spill

"... a mixture of non-petroleum-based fats or oils. Non-petroleum oils include synthetic oils, such as silicone fluids, tung oils, and wood-derivative oils such as resin/rosin, animal fats and vegetable oils."


On a sunny Sunday October afternoon, a friend and I spotted plume of grey sludge, as we sat on a south-facing bench on San Leandro Bay near the Martin Luther King Jr Regional Shoreline. High tide was just beginning to ebb as I noticed an unusual right-to-left motion on the water in the distance. The air was warm and still. Hardly a cloud. The water was like mercury except for that curious movement that I kept noticing as we intently engaged in conversation about the books we are both writing about orphans and orphanages. I had seen movement like this before when I was a boy of 17 fishing for gar on the Trinity River in Texas, upstream of a sewage pipe. But that didn't register at the time.

A good deal of time passed as the restless indistinct mass crept toward us while we talked. Steam vapors rose from it as it curled around the eastern tip of Alameda Island and picked up speed. I looked at my watch. It was ten after four.

Eventually the undulating mass was close enough to make out its gelatinous consistency and a greyish color I had never seen in nature. Entrapped bits of debris bobbed and weaved. We stopped talking, hypnotized, as the mass of sludge rode the gathering current into the Oakland-Alameda Estuary. It was like being in a Sci-fi flick. "What the hell is this?" I said. "It can't be normal."

That was October 12, 2014. By the following mid-January, a massive seabird kill concentrated near Alameda was being reported in the news. The cause--a "Grey Goo of unknown origin."


Below (Image 1c) is the bench where we sat when we first noticed the plume.


Alarmed now, we stood and followed from the bike trail on the Oakland side of the estuary as the accelerating sludge headed toward the High Street Bridge, hugging the far shoreline where the current was strongest. Below is a map (Image 1e) showing in red the plume's path that we observed between 3:45 and 6PM on the Sunday the Raiders were getting clobbered by the Chargers last year.


Image 1d was taken in March, 2015, from a few hundred yards north and east of the Vantage Point bench to show the Otis Street/Bay Farm Bridge hidden from view in Image 1c. Notice the abundance of sea fowl. It's a mixture of surf scoters, grebes and stilts.


San Leandro Bay is a treasure of sea bird life that is severely threatened by effluent from not just Alameda's lagoons. Four natural estuaries drain street run-off here, as shown in the following Image 1w.



























AN ECOLOGICAL DEAD ZONE? The Google Maps drill-down at right (Image 1n) shows an apparent ecological "dead zone" delta on Alameda's southern shoreline surrounding the Elsie Roemer Bird Sanctuary. Note the darker coloration compared relative to the healthy shoreline due east of the dock connected to Weir #1 in the tail of the lagoons.

Also note the three storm sewer outlets due west of the dock. This area shows the ecological effects of a concentration of street run-off from these three sources plus the discharges from the lagoon portal. YES, the lagoons capture run-off from storm sewers. People have been known to toss kitchen grease in the lagoons as well as used cat litter, all of which are illegal.

This discoloration shows that tidal marsh recyclers (mollusks, worms, crustaceans, etc.) are having a hard time keeping up with processing the city's organic output.



At left is the dock referred to above in Image 1n. Beneath the dock is the lagoon portal into San Francisco Bay from a pipeline leading from Weir #1.

Note the Otis Street/Bay Farm Bridge visible in the distance. Beyond the bridge is San Leandro Bay, where the plume of sludge was noticed by my friend and I.







This is a frontal view of the dock viewed from the south, across the channel. Below the dock is the lagoon portal "Rectangular Orifice" of the pipeline to Weir #1.




The Rectangular Orifice at left is the most probable source of the sludge, but proving so requires laboratory analysis of samples from the grey-green moustache and surrounding area to compare with samples of the Mystery Goo reported in news media since mid-January.

Cal Fish and Wildlife have taken samples for this purpose.






At right is a view (Image 1g) from within the finger lagoons at the end of the "tail," showing Weir #1, indicated by the arrow.

A weir is any device within a body of water that controls or influences the flow.








Wednesday, April 8, 2015

Bid Specifications for Sewer Line Replacement


Item 5 of the following excerpt from a City bid document specifies 91 linear feet of directional drilling that would involve use of drilling mud

The Milestones specify an "N.T.P" (notice to proceed) date of Oct-Nov 2014, is in time to create the October 12 plume of grey sludge observed entering San Leandro Bay from the direction of the lagoon's portal.


BID DOCUMENT
PROJECT DESCRIPTION:
The following items are important elements of the proposed work and the contractor should refer to any similar work she/he has performed in the past within their pre-qualification application.
1. Saw cut and remove an existing 10" sewer pipe from an existing retaining wall adjacent to a Lagoon waterway including removal of the corrugated metal roof covering of the pipe and its supports. The wall is a historic seawall built in the early 1900’s. The waterway is owned by a private Homeowners association and private residents. The wall is in need of minor repairs. Private laterals through the existing wall will need to be abandoned.
2. Construct a temporary access road within the lagoon during the drawdown period for Item No. 1 pipe removal. Care must be taken of the historic lagoon seawall during the pipe removal. Contractor to provide a design submittal with details of the pipe removal and temporary access.
3. Install new sewer pipe - main extensions by open cut construction with in the public street Right of Way. The street is asphalt; a. Install PVC SDR 26- 4" sewer laterals from the sewer main to the back of walk and also to the existing single family structures within well- established lawns adjacent to historic homes on four streets;
4. Install and restore surface improvement on 21 separate private lots including various varieties of the following: grasses, bricks; concrete; landscaping plants, trees and bushes; specialty pavement surfaces; concrete curb, gutter and sidewalk. The contractor will be expected to enter and exit private properties to perform said work efficiently and with concern and respect for resident’s existing structures, improvements and property. Working limits are restricted to 10 ft. wide maximums with the pipe installation as the centerline on the existing private properties.
5. Installation of sewer pipe by horizontal directional drilling of +/- 91 LF of 8" sewer main between two manholes in close proximity to existing homes using front steer guided bore and jack method with steel bend VCP. Install new sewer manhole and rehabilitate existing sewer manhole with epoxy/cement like coating on Hawthorne Street
6. Abandonment of existing sewer pipes by filling with lightweight cell-Crete or equal under residential structures.
7. The on-site Resident Engineer of the Construction Company has recent construction project management experience in working directly with the residents at their homes and property before, during, and after the construction and subsequent restoration of the surface improvements in a high profile historic area. References would be helpful.
8. Location of existing utilities by pot holing and protecting existing utilities in place in an older neighborhood including water, storm drain, underground telephone, gas lines, fiber optic, underground electric and cable.
9. Open cut installation of 700 LF of 8" sewer main in private back yards of local residents with subsequent restoration in "like kind" of various surface improvements. Reconnection and or installation of four new private sewer laterals to new sewer main.
10. Install new sewer pump station (approximately 5 ft. diameter, 17 ft. deep), motor control panel, SCADA communication equipment and construct approximately 700 LF of 4" PVC C900 force main on Paru Street.
11. Install new PVC SDR 26 -8" sewer main and sewer manholes on St Charles Street.

DRAWINGS: The plans and specifications are not available for review at this time.
PROJECT SCHEDULE: The anticipated Project schedule is summarized below:

Preliminary Project Milestones
Anticipated Date
Issue Request for SOPQ
                     April 4, 2014
Pre-Qualification Conference and submittal from contractor of Questions and Comments form due Date
                     April 21, 2014     
Issue PreQUAL - Q and A and comments
                     April 28, 2014
SOPQ Packages Due to City
                     May 5, /2014
Final Plans and specifications to City Clerk
                     May 19, 2014
City staff Reviews SOPQ and Rank firms 
                     May 21, 2014
City staff notifies all firms with Ranking status
                     May 22, 2014
Final Plans adopted by City Council
                     June 17, 2014
City Invites Bids from Qualified Bidders list
                     June 20, 2014
Bid Opening/Bid Due Date
                     July 24, 2014
Project Award
                     Sept, 2, 2014
N.T.P. [notice to proceed] issued
                     Oct - Nov 2014
Substantial Project Completion
                     May 2015
Anticipated Project Final Completion
                     July 2015


The Owner has determined that Prospective Bidders on the Project must possess a valid State of California Class A General Engineering Contractor License at the time of submission of this SOPQ.
The entire SOPQ Package (SOPQ questionnaire answers and financial statements), submitted by Prospective Bidders, are not public records and are not open to public inspection. All information provided will be kept confidential to the extent permitted by law. However, the contents may be disclosed to third parties for purpose of verification, or investigation of substantial allegations, or in the appeal hearing. State law requires that the names of Prospective Bidders applying for pre-qualification status shall be in the public records subject to disclosure, and the first page of the SOPQ questionnaire will be used for that purpose.
The Prospective Bidder shall provide only complete and accurate information in their SOPQ Package. The Prospective Bidder acknowledges that the Owner is relying on the truth and accuracy of the responses contained herein. Each SOPQ questionnaire must be signed under penalty of perjury in the manner designated at the end of the form, by an individual who has the legal authority to bind the Prospective Bidder on whose behalf that person is signing. If any information provided by a Prospective Bidder becomes inaccurate, the Prospective Bidder must immediately notify the Owner and provide updated accurate information in writing, under penalty of perjury. Should a Prospective Bidder omit or falsify requested information, the Owner may designate the Prospective Bidder as not pre-qualified.
The Owner reserves the right to waive non-material irregularities and omissions in the information contained in the pre-qualification application submitted and to make all final determinations. The Owner reserves the right to cancel this Notice or to reject any and all responses and SOPQ Packages, in its sole discretion. City of Alameda – General Contractor SOPQ -4-g:\pubworks\cip\90909 lagoon seawall sewer\pre qualification documents\prequalification for lagoon sewer replace.doc
The Owner shall not be liable for any costs incurred by Contractors in the preparation and submittal of responses to this Request for Qualifications. The Prospective Bidder accepts all risks and cost associated with the completion of the SOPQ Package without any financial guarantee by the Owner.
SIGNED: City of Alameda Public Works DepartmentCapital Improvement ProjectsCarol Clark, PEProject Manager/Associate Civil Engineer

***END OF NOTICE***